Domestic Air Tightness Testing
Ryedale Air Tightness Testing (RATT) take the
hassle out of testing & SAP calculations
by providing a local, quick, accurate, and integrated
service.. … all under one roof! Ryedale
Air Tightness Testing is BINDT accredited and
use only the highest quality UKAS calibrated
instruments.
From April 2006 Part L of the Building Regulations
were amended to reflect the Governments continued
commitment to the reduction of green house gases
and wasted energy. All new domestic dwellings
with just a few exceptions are required to demonstrate
an Airtightness of not less than 10m³/(h.m²)@
50 Pascals.
HASSLE-FREE TESTING
- We offer SAP and Air Tightness Testing under
one roof which means a seamless and integrated
approach to managing the latest regulations
on your behalf.
- We commit to help you with regard to failed
tests and re tests.
LOWER COSTS
- Local testing results in less travelling
which mean lower costs to the customer.
- For multiple/volume tests we offer some
of the most attractive discounts available.
ACCURATE RESULTS
- A qualified architect and calculations checked
on the latest CAD software. A decade of experience
in diagnostic testing ensures that pre test
procedures deliver you the best possible results.
- We commit to spend more time sealing up
your property in accordance with ATTMA guidelines,
which means the prescribed level of air tightness
is achieved.
- Results are only as good as the quality
of the build and the accuracy of the test.
EMERGENCY TESTING:
- If your completion timelines have slipped
we will test for you Sundays and through the
night if required.
- If required, just call our emergency number
07946 315 721
Achieving air tightness
Check list – prior to the test:
- Access for fan equipment to be installed
- No airflow restrictions in front or around
fans – a clear door opening is preferred
- Electrical power (240 Volts)
- Windspeed less than 13 mph
- All mechanical ventilation/heating systems
to be de-activated
- Consider local restrictions eg noise, working
hours
- Acceptable route for the air to flow from
the fans.
- Workforce can remain in the building during
the test but access in/out of the property
is forbidden.
- Depending on the volume of sealing required
a typical test should take 1-2 hrs
Costs
To ensure we offer the most competitive price
we estimate each project separately, there are
attractive discounts available for multiple
tests.
We provide two levels of service, a ‘routine
test’ with a 14 day lead-time and an ‘emergency
test’ for projects where time lines have
slipped.